PHASE 2 - PROJECT SPECIFICATION
CONSTRUCTION MANAGER:
- CREATE SECOND PROTOTYPE
- Download file from link, print, and scan finished work into Google Drive folder.
FINANCIAL OFFICER
- ORGANIZE A MATERIAL LIST
- Create a new Google Sheet in your Engineering folder and share it with your group.
- COMPLETE USER ANALYSIS
In the design process, User Analysis is the means by which scientists, engineers, and technical writers determine the characteristics of the users which will influence the development of software systems or other technological products.
PROJECT LEADER & LIASON
- OUTLINE TASKS IN GANTT CHART
- Create a new Google Sheet in your Engineering folder and share it with your group
- Number Tasks down Column A, Start Date Column B, and End Date Column C
- Begin Numbering Weeks 1-18 across Row 1
- Highlight cells in different colors for each team member and include key at the bottom of the chart
- Include Status in last column (Active = 0% Complete, Complete = 100% done, or list 25%, 50%, 75%)
- OUTLINE A DECISION MATRIX
- Create a new Google Sheet in your Engineering folder and share it with your group.
INVESTIGATIVE TECH & WEBMASTER
- OUTLINE SPECIFICATIONS FOR SELECTED PROTOTYPE
- Create a new Google Sheet in your Engineering folder and share it with your group.
- Identify specific needs based on SDR
- DEVELOP TESTING PROTOCOL
- PREPARE PRELIMINARY DESIGN REVIEW (PDR)
- Add to your Design Review Google Slides in your Engineering folder.
- Arrange to present to the project partner and stakeholders (IF POSSIBLE - or send URL)
- EPICS PROJECT EVALUATION RUBRIC
- Make a copy of this Google Doc, add it to your Engineering folder with [YYYY-DD-MM] LASTNAME at the front of the filename, and share it with your instructor when you have finished your self evaluation.